SD Genevieve – Before and After Transformation

The I.M.E Group recently carried out a variety of marine electrical and engineering work on the SD Genevieve

This included:

– Renewal of aft end fendering

– Fitting of new anodes

– Extensive work on the engine and alternators

– General maintenance

– Electrical testing of critical apparatus

– Full painting

From a visual perspective, one of the most obvious transformations was to the hull

Another job successfully completed to the highest standards

Watch the vessel being lifted onto the dry dock here

SD Genevieve – Dry Dock Lift

Serco’s vessels just keep coming…

No sooner had we got the scaffolding on the SD Norton ready to get started on that scheduled project, and the SD Genevieve arrives

At over 40 years old, she will inevitably need some tlc during our planned work but our engineers will be more than capable of taking care of her

Check out the fantastic before and after transformation here

SD Norton – Dry Dock Lift

Marine engineering & Fabrication by The I.M.E. Group

Serco’s SD Norton being lifted on to the dock at Trafalgar Wharf, ready for us to carry out a variety of tasks, including electrical work and fabrication services

The vessel will be in our hands for approx. 1-2 weeks and will be handed back, once all work has been successfully completed and approved

Any updates will follow below the video, as the job progresses


Progress Updates

Moving a 17 ton vessel is not easy, unless you have the skills to do so

Our specialist team at Trafalgar Wharf, make light work of the move and get it off the dry dock, ready for us to complete our scheduled work

Great job by all concerned!!!

Installation of new dredge pump on Sand Heron by IME

 

IME carried out the removal of the existing motor and drive cabinets,  plus installation of the new drives, and manufacture of the motor bed plate.

IME then fitted the motor to the bed, laser aligned to the pump, and commissioned.

All of this work was completed within the timescale and on budget.

 

Compex installation at new gas site near Guildford

[smartslider3 slider=2]

Our Compex electricians recently carried out an installation at a new gas site near Guildford.

The control container was built in our workshops transported to site, where it was installed, wired, and commissioned onsite.

The project was delivered on time and on budget.

The site is now LIVE and producing 1MW of power into the grid.

IME Group & Trafalgar Shipyard offer the complete Dry Dock, Refit & Repair Service

IME are pleased to announce that we are now working with Trafalgar Shipyard in Portchester, to provide the complete dry dock and ship removal and repair service.

Located at Trafalgar Shipyard, Portchester, near Portsmouth.

Watch our video below, which outlines our service.

  • Unique facility
  • Fast docking with easy access
  • Hoist large vessels out of the water
  • Operates a1000 ton ship lift
  • Mechanical dry-dock
  • Provide repairs, refits, repainting and maintenance including:-
    • Engineering & Fabrication
    • Hydraulic Repairs
    • Electrical Repairs & Installation

Heron Refit Southampton

The IME Group have now grown and are now undertaking refits in Southampton docks.

IME Group have just recently completed a refit of the Sand Heron for Cemex Marine. Work involved the extensive fabrication and welding of the vessel alongside in southampton docks.

This was completed 5 days earlier than planned, and the client was very happy with the overal results.

The Health & Safety processes and general attention to safety of the work was found to be very positive and reassuring.

Close to 100 safety inductions were made during the refit.

Safety matters are often reported when something goes wrong, and it is pleasing to be able to provide some positive feedback.

Overall it was very positive feedback and was highly commended by Lloyds register, particularly due to the confined space entry and evacuation arrangements.