T: 0044 (0) 2380 235205
E: info@ime-group.co.uk

IME are now proud to announce we have achieved ISO 14001 and ISO 45001 certification.

Two and half years ago IME achieved ISO 9001.  We are now proud to announce we have achieved ISO 14001 and ISO 45001 certification, as part of our Quality Management System.

IME Group have actively engaged in a continuous performance improvement journey over the last two and half years.  Which started with addition of Engineering and Fabrication being added to the IME Group.

By participating, achieving and maintaining agreed criteria in quality, and sustainable improvement, plus achieving the ISO certification our customers can have confidence in IME ability to provide a service that is safe, reliable and of good quality.  This will allow IME to access new markets, with improved Safe, Health and Environmental performance, and more besides.  This will help hold or reduce cost, and satisfy our customer’s needs.

Going forward, as part of IME continuous improvement program, we are aiming to achieve ISO 27001, Information Security Management System (ISMS) before the end of 2019.  This will allow us to establish, operate, monitor and review information security for both IME and our customers and be fully complaint.

Installation of new dredge pump on Sand Heron by IME

 

IME carried out the removal of the existing motor and drive cabinets,  plus installation of the new drives, and manufacture of the motor bed plate.

IME then fitted the motor to the bed, laser aligned to the pump, and commissioned.

All of this work was completed within the timescale and on budget.

 

Compex installation at new gas site near Guildford

[smartslider3 slider=2]

Our Compex electricians recently carried out an installation at a new gas site near Guildford.

The control container was built in our workshops transported to site, where it was installed, wired, and commissioned onsite.

The project was delivered on time and on budget.

The site is now LIVE and producing 1MW of power into the grid.

EMF Testing in South Africa

IME arranged for 2 engineers to be flown out to South Africa for 7 days, where they provided and extensive EMF testing onboard the Discovery ship.

The work was successfully completed on time and budget.

IME Group & Trafalgar Shipyard offer the complete Dry Dock, Refit & Repair Service

IME are pleased to announce that we are now working with Trafalgar Shipyard in Portchester, to provide the complete dry dock and ship removal and repair service.

Located at Trafalgar Shipyard, Portchester, near Portsmouth.

Watch our video below, which outlines our service.

  • Unique facility
  • Fast docking with easy access
  • Hoist large vessels out of the water
  • Operates a1000 ton ship lift
  • Mechanical dry-dock
  • Provide repairs, refits, repainting and maintenance including:-
    • Engineering & Fabrication
    • Hydraulic Repairs
    • Electrical Repairs & Installation