T: 0044 (0) 2380 235205
E: info@ime-group.co.uk

1206(A) and 1207(A) Barges

Another project successfully completed

Work included:

– Lifting the barges out of the water and into the yard
– Erect scaffolding, cover with a net and HP wash the hull
– Survey (thickness test). Serco supplied their own engineer for this
– Carry out relevant repairs, subject to the survey (none in this occasion)
– Paint vessel as per spec
– Remove scaffolding, relaunch and ensure watertight integrity

There will be more work required on the two vessels in the future but for now, they’re back in the water, on time and on budget